124103 
德国伍德高压技术公司(Uhde HPT GmbH)
公告:
    

Emergency Manufacturing at Uhde HPT

作者/来源:德国伍德高压技术公司(Uhde HPT GmbH)    日期:2008-10-06    点击量:789

Sunday afternoon...
16:00 Uhde receives a phone call about an emergency stop in a LDPE Plant.
17:00 The damaged compressor bend is dismounted and transported to Uhde.
19:00 Meeting with the Uhde fabrication staff and discussion about the emergency repair.
23:00 The bend arrives at Uhde, the damaged part is cut and a flange connection is fabricated.

Monday morning…
06:00 Pressure test of the repaired bend is executed.
07:00 The bend dimensions are varified with laser the tracker http://www.faro.com/content.aspx?ct=uk&content=pro&item=3.
09:00 TUEV arrives for the third party approval.
09:30 The modified bend is packed and protected for transport.
10:30 The repaired bend leaves the work shop to the plant.

If you have an urgent problem, please call us at +49-2331-967-0.

德国伍德高压技术公司(Uhde HPT GmbH)     技术支持:元丰咨询     蜀ICP备05031754号-2